Infrastructure: Two years after construction in the core area of Samtse town was approved, progress remains at a snail’s pace. Only three buildings are currently being constructed. The Samtse ...
Three main exporters in Samtse exported a total of 373.42 metric tonnes (MT) of oranges worth Nu 15.01 million (M), bringing an end to the export for the season. Although export was expected to start ...